How We Automated Fee Proposals For A Structural Engineering Firm

Overview

At small structural and civil engineering firms, the principal prices every job. Each scope email means reading the drawings, guessing hours phase by phase, remembering the work that never shows up on the sheets and writing the letter. None of that time is billed, and a fee set too low is paid for in construction administration.

Even STRUCTURE magazine’s advice to new firm owners this year is to list the tasks and assign hours “on paper if the job is small, or preparing a spreadsheet if the job is large.”

This system does the reading and the math for them and covers these workflows:

  • Gather every scope email in one place and ask the architect for what’s missing
  • Set the hours from what similar past jobs really took
  • Build the fee, check it and write the proposal letter

System Design

The system connects to the firm’s inbox in Outlook, BQE CORE, QuickBooks Time and their Word template. It reads each request, sets hours from past jobs, builds and checks the fee and drafts the letter. Nothing goes to a client until the principal approves it.

How a fee proposal request moves through the system

A request comes in

Every scope email in one inbox, with the scope read from the email and drawing list

  1. A scope email comes inWith the drawing list
  2. It lands in one inboxWith a go/no-go note
  3. Scope filled inSize, phases, construction cost
  4. Missing info asked forOne click drafts the question

Go/no-go note

  • Prior work with the client
  • Who else is bidding
  • Whether the project is funded
  • Whether the scope can be defined

Flagged as missing

  • No geotech report
  • No site visit count

Hours come from similar past jobs

Pulled from BQE CORE time entries, then built by phase and role at the firm’s rates

PrincipalProject engineerEITDrafter
SD
DD
CD
CA

What usually gets left out is added

Hours for the work that doesn’t show up in the drawings, added to the phase it lands in

  • Weekly coordination calls
  • RFIs
  • Specs
  • Submittals
  • Plan check responses
  • Structural observation visits

The fee is checked

Against 0.5 to 1% of construction cost, then sized and set to a billing method

Against construction cost0.5%1%
Job size
  • Small
  • Medium
  • Large
Billing method
  • Fixed by phase
  • Hourly
  • Hourly to a max

The principal approves and it goes out

Nothing reaches the client until the principal approves it

  1. Letter draftedIn the firm’s Word template
  2. Indemnity clause flaggedInsurable wording suggested
  3. Principal reviews and approves
  4. Sent with OutlookLogged in BQE CORE
  5. Client opens itThe principal sees when

A won job becomes a project in BQE CORE with these budgets

  • System step
  • Client step
  • Principal decides
  • Not part of the fee

What The System Does

  • Puts every scope email in one requests inbox with a go/no-go note: prior work with the client, who else is bidding, whether the project is funded and whether the scope can be defined
  • Reads the email and the drawing list and fills in the scope: size, phases and estimated construction cost
  • Flags what’s missing, like no geotech report or no site visit count, and drafts the question to the architect in one click
  • Pulls hours from similar past jobs out of BQE CORE time entries, and one click sets this job’s hours from what those jobs took
  • Builds the fee by phase and role (principal, project engineer, EIT, drafter) at the firm’s rates
  • Adds hours from an often missed checklist: weekly coordination calls, RFIs, specs, submittals, plan check responses and structural observation visits
  • Checks the fee against 0.5 to 1% of construction cost, sizes the job as small, medium or large, and sets the billing method: fixed by phase, hourly, or hourly to a max
  • Drafts the proposal letter in the firm’s Word template: project, scope and assumptions, deliverables, schedule, fee by phase, rates, additional services and exclusions
  • Flags indemnity clauses in the client’s agreement that go beyond the standard of care and suggests insurable wording

What Stays With People

The principal reviews every proposal, exports it to Word if they want to edit it, and approves it. Nothing goes out without them. Once they approve, it’s sent through Outlook and logged in BQE CORE, so a won job becomes a project with these budgets, and they can see when the client opens the proposal. The rates, the fee range and the job sizes are theirs to set, and they decide which jobs are worth bidding at all.